SPECIFICATIONS: MAIN CHARACTERISTICS LOA: 48M 157’06” Beam: 8.66M 28’05” Draft: 3.29M 10’10” Builder: Sterling Year Built/Refit: 1983 / 2006 Hull: Carbon Fibre Reinforced Alloy Superstructure: Fibre glass Flag: St Vincent and the Grenadines Classification: ABS Speed: (max/cruise) 14 / 10 knots Gross Tonnage: 540 tonnes Net Tonnage: 162 tonnes Range: 4,000nm approx. Guest Accommodation:18 guests in 8 cabins Crew Accommodation: 15 crew members MAIN MACHINERY
Main Engines: 2 x Caterpillar 3512TA V12 775KW Diesels Generators: 2 x Caterpillar 3406T 225HP Diesels 415 V 3 Phase 220 V Single Phase Stabilizers: Naiad Anti-Roll Model 525 Water makers: Sea Recovery (2 units) 5,300L & 6,814L per day Navigation Electronics: Furuno Bow Thrusters: Side power Auto Pilot, Furuno Radar, AIS, Magnetic Compass, Gyro Compass, VHF Radio, Chart Plotter, GPS and Echo Sounder. CAPACITY
Fuel: 83,000 Litres
Fresh Water: 35,000 Litres
Water maker: 12,000 Litres/Day
ACCOMMODATION
MAIN DECK Main Saloon, Bar Counter, Dining Area, Main Galley Master Stateroom and VIP Room, both with Ensuite Bathrooms LOWER DECK Six Guest Rooms • 2 Nos. Double Bedroom • 2 Nos. Twin Bedroom • 2 Nos. Triple Bedroom • All with Ensuite Bathrooms UPPER DECK Wheelhouse, Chart Room and Study Room SUN DECK Helipad, 2 Nos Davit, Tenders and Jet Ski ENTERTAINMENT EQUIPMENT Seatel Antenna - Astro Computerised Karaoke Sound System MP3 Music System DECK & SAFETY EQUIPMENT 4 Nos Life Raft, Lift Buoys, Fire Extinguishers, EPIRB, EEBD, Fire Sprinklers, Portable Water Pump c/w Fire Hose etc. GALLEY LAUNDRY Fridge, Freezer and Cold Room Washing Machines and Dryer TENDERS & TOYS Boston Whaler Fibre Glass Speed Boat (21 feet) with 200 HP 4 Stroke Engine Nouvurania Speed Boat (RIB) with 115HP 4 Stroke Engine Yamaha Jet Ski - Wave Runner XL 700 WORKS/REFITS Stabilizers • New Naiad stabilisers was installed in October 2010. • Model: Naiad 525 – anti roll stabilisers system with 2 new fins. • Service and maintenance parts replaced in March 2014: 1. Suction Filter Element. 2. Press Filter Element. 3. Cylinder Rod Seals Kit. 4. Reservoir Zinc Anode. 5. Case Drain Zinc Anode. 6. Piston Pump. Main Engines Two main engines overhauled in March 2010. Generated On 1/19/2021 9:08:15 AM by Greg Dagge Generators • Major overhauled Port & Starboard Generators (engines + alternators) – May 2015. • Overhauled and Calibration of alternator engine ‘Woodward’ governors. • Overhauled Port & Starboard transmission gear. • Repair and Service Port & Starboard heat exchanger. Interior • Upgrading works were done from time to time when necessary. • Upgrade of 6 nos. Guest Rooms were done in Oct – Nov 2015. 1. Painting of Cabinet, beds, doors and wardrobes. 2. Replaced wallpaper and curtains. 3. Replaced wallpaper at the corridor – lower deck. • Replaced Roman Blinds for Main Saloon, Dining Area, Study Room and two Staterooms. • Replaced carpet in the Study Room. • Upgrading works were done on the Air –Conditioning System.